Skip to main content

Seasight Solutions launches the new Adaptive Ladder Hanger for Offshore Wind Turbine Maintenance


28. november 2023
News

In an advancement for offshore wind turbine maintenance, Seasight Solutions has launched its latest innovation, the Adaptive Ladder Hanger. This new product promises to enhance the way maintenance operations are conducted on offshore wind turbine Transition Pieces (TPs).

The Adaptive Ladder Hanger stands out with its remarkable capability to carry loads of up to 200 kg, while itself maintaining a feather-light weight of just 7.8 kg. This exceptional feature allows a single operator to handle the device with ease, ensuring a swift and efficient setup process. With just three simple steps, the hanger securely locks onto the ladder, signaling it is ready for action.

This innovative tool is not only a boon during regular maintenance routines but also serves as a reliable solution in various challenging scenarios, such as:

  • When hoisting equipment is unavailable or malfunctioning.
  • In the event of a breakdown.
  • During times when there is a lack of power on the TP.

An indispensable part of the offshore wind turbine maintenance toolkit

Moreover, the Adaptive Ladder Hanger proves to be an invaluable asset during the turbine erection phase, showcasing its versatility across different stages of turbine life.

Designed to facilitate the hoisting of a wide range of items, including installation and maintenance tools, auxiliary equipment, and any supplementary tools, the Adaptive Ladder Hanger is set to become an indispensable part of the offshore wind turbine maintenance toolkit.

Seasight Solutions’ commitment to innovation and practical design is evident in this product, which is poised to enhance safety, efficiency, and convenience for operators working in the demanding offshore environment.

Press contact

Thomas Halkjær Kristensen
Mail: thk@seasightsolutions.com
Phone: +45 5140 0511


Latest News from Seasight Solutions

Silvasti Erects First Turbine at Pahkakoski Wind Farm with Seasight Solutions’ APS

Silvasti has successfully erected the first wind turbine in their inaugural Transport, Cranes and Installation (TCI) project at the Pahkakoski Win…

Seasight Solutions Showcases Innovation at WindEnergy Hamburg 2024

Seasight Solutions is determined to make a significant impact at this year’s WindEnergy Hamburg, the world’s leading trade fair for the wind indus…

Seasight Solutions to participate in DALO Industry Days for the fifth consecutive year

Seasight Solutions is proud to announce its participation in the DALO Expo in Ballerup for the fifth consecutive year. The event brings togethe…

Seasight Solutions expands market for turbine blade installation innovation

Finnish-based wind power logistics company, Silvasti, has invested in their first Autonomous Positioning System (APS) for wind turbine blade insta…